The Jerome Schottenstein Center at Ohio State is the well-known local home to sporting events, concerts, and a wide variety of family shows and touring productions. This complete renovation has made the control room a true state-of-the-art facility. The room now includes two slightly modified RACKBLOCKS consoles; a 9BAY front console with an extended switcher position, and a 7BAY rear console with the audio board recessed into the worksurface. Our new consoles and the updated equipment dramatically improved the production team’s capabilities, and the modular design of RACKBLOCKS components makes changing positions as easy as swapping equipment turrets and filler panels (tool-free…), if ever, whenever needed, in the future. And RACKBLOCKS’ low pricing helped keep the project within budget. These room-at-work images were generously provided by the production staff at OSU. Love the chairs…!